Sutter Alta Bates Summit Medical Center is an urban medical campus featuring 14 buildings covering over 1,000,000 square feet. Syserco was selected by the Integrated Project Delivery Team (Sutter, DPR, and Superior Air Handling) to perform the HVAC Controls work for the new Patient Care Pavilion. Syserco was selected for our track record of delivering health care projects and our demonstrated ability to meet the team’s budget, provide an experienced BAS Team, and deliver a high-quality project in a partnership-oriented environment.
As an integral member of the LEAN Construction and Integrated Project Delivery Teams, Syserco actively participated in Big Room and Cluster Group meetings as well as multiple mockups including the patient room mock-up and design process. Pre-construction deliverables included; Controls Workflow Mapping, Value Stream Mapping, Preliminary Design and Coordination with the AE Team, and OSHPD submission support.
The project consists of a new Patient Care Facility and Emergency Department with 234 patient care rooms and 14 negative pressure isolation rooms. With Syserco installed Alerton equipment and technology, Alta Bates Summit able to realize their goals of green building certification while combining next generation technology and a comforting, healing environment.